Drilling Mud Zero Discharge Treatment

Drilling Mud Zero Discharge Treatment

Drilling Mud Zero Discharge Treatment

Drilling mud from different stages goes through solid-liquid separation, stable solidification and liquid recycling through chemical and physical methods. The system is highly integrated with modular skid mounted equipment for different needs.

Drilling Mud Zero Discharge Treatment

Drilling Mud Zero Discharge Treatment

Drilling mud is produced in reservoir exploration and development. The waste mud consists of a large quantity of hydrocarbons, heavy metals, minerals and macromolecule organic compounds,  which can cause potential damage to the surrounding soil. Currently, two methods are commonly used in mud treatment, but none of them are perfect. The solidification and landfill technique cannot treat the mud completely and such a method may take up arable land. The other way of constructing treatment plants may give rise to much cost in transportation and secondary pollution. Alternatively, Haimo ESG has developed a new mud control technique and treatment, resulting in no contact between soil and waste mud, which has been applied to most of the major fields in China.

Drilling Mud Zero Discharge Treatment

Drilling Mud Zero Discharge Treatment flow chart

The large grains from the Shale Shaker produces solids and liquid mud after flushing and dehydration. This liquid, in addition with other liquid from the Desander, Desilter and the Centrifuge; undergoes destabilization dosing, and separates through the filter press. The resultant liquid returns to the Mud Circulatory System, where the solids are treated safely together.

Treated liquid:
pH7.0-8.5
Mud Density≤1.08g/cm3
Sand Concentration≤0.15%
Funnel Viscosity≤25s
Treated Solids(Extract)
pH6~9
CODcr≤100
Heavy MetalQualified
Hydrocarbon≤10
  • Treatment is conducted while drilling - ensures no damage to the surrounding soil.

  • Flexible treatment methods - different unit combinations can be applied according to specific well site, drilling stage and mud system.

  • Good treatment results - stable solidified products can be used for site substructure and roadbed construction, whereas the liquid could be used to prepare drilling mud.

  • Skid mounted - standard size, easy transportation and fast installation.

Well type:  Oil well     Natural gas well   
Well direction:  Straight well     Horizontal well   
Mud system: Spud:
Second section:
Third section:
Remaining sludge treatment requirement:  Discharge     Reuse for other wells
Solids treatment requirement:
* Name:
Tel:
* Email:
Notes:
 

Next:Skid-mounted Integrated Oil Field Produced Water Treatment

Produits et Services

Produit et Service de mesure du débit multiphasé
Equipement et Service de fracturation
Equipement et Service de protection d’environnement
Solution et Service d’optimisation de production
Exploration et Production du pétrole et du gaz
Case Study
Contact
  • Haimo à Colombie OSS
  • Carrera 9b Calle 117A-41
  • Bogota Colombia
  • Tél: +57 31 7498614
  • Mobile: +57 315 797 2730
  • E-mail:contacto@oss.com.co
  • Pour toute question, merci de contacter notre Support Client